EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
-
Wing tips and flaps
-
Hardware
-
Hardware
-
Wing Mounting
-
Prep
-
Wing Root Fairing
-
Strut fairings
-
Strut fairings
-
Wingtips
-
Wingtips
-
Wingtips
-
Wingtips
-
AD-142 Fuel Tank...
-
Left Wingtip
-
Wing Removal
-
Mounting wings
-
Wing Attach
-
Left Wing Tip
-
Wing Struts
-
Wing Struts
-
Wing Struts
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Right wing build up
-
Right Wing Build-Up...
-
Right Wing Build-Up...
-
Right wing build up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing buildup
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Spars
-
Spars
-
Wing Build-Up
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jun 28, 2021
Wing Build-Up
- (2.6 hours)
Category: Wings
Finished riveting stringers on left wing, top skin. Trimmed tags off gap seals and trimmed ends flush. Clecoed gap seals and set top parallel with top of wing skin.
Ready to match drill.
20210628_122723.jpg
20210628_122736.jpg
20210630_085320.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.